Saturday, April 30, 2011

Framing and Roof Trusses are going up!!

Over the past 2 days the builders have been assembling the house frame and roof trusses.

Theatre Room
From Alfresco looking through sliding door opening
Laundry
From Kitchen looking towards Rear hallway
Study
Main Bedroom
Front Of Garage
Front of house (Looks like windows will be going in soon)
Front Porch
Front door looking down entry hallway
Looking from main bedroom into ensuite and robe
Looking down hallway
Looking from alfresco to grand family
Grand Family
Theatre Room
 Back of house
Alfresco

Monday, April 18, 2011

External Colour Selections

Bricks


(Austral Chocolate) with Off White mortar

Roof Tiles

Blackstone

(Bristile Heritage Blackstone)


Aluminium Windows, Doors and Flywire Screens 



Black

Spouting, Fascia, Downpipes, Garage door, Front door.



Monument

Render



Dulux Namadji (Only Pic I could find)

Saturday, April 16, 2011

House Plans and Considered Networking, Audio options etc...

Ok Below are the plans for the house and the plans for the network and distributed audio. These are not final as of yet. You can also tell when we originally wrote them i did not have the completed house plans for our build.





Friday, April 15, 2011

Introduction and current Pictures

Hi All,
Just a quick introduction.

Melany and myself have decided to build with Henley Homes. We have chosen the Cooper with a few variations. These include a 1.8 meter garage extension with rear roller door access, grand family addition and grand alfresco addition.

I have started this a little late and our slab was poured today. I will post up all of the pictures to date. And then will be posting updates as they come.

I hope you all enjoy!!!