Its been a few weeks since the last update. We cant get inside the house so its hard to take photos.
All sinks have been in installed along with shower screens, door handles, door stops, towel rails, Front Render colour applied, Front Door Handle, All electrical fitted off all plumbing fitted off besides the kitchen sink.
We cant be to far off, Laminate timber floors need to be put down, Pantry and robe shelves still need to be installed but I think that's about it. They have a few cosmetic things to fix too and no doubt we will find a few more things on Pre handover with the inspector.
So far its been a fairly good experience but I will say that you need to keep an eye on everything during the build and get a 2nd opinion if you have a hunch that something is not done correctly. We have used a private inspector at 3 stages and he has been worthwhile. I have also picked up numerous things that have been done incorrectly over the build.
Anyway here are the photo's
Hi, I visited all the photos of your house, it very big and beautiful all the accessories are matched to each other are very good.
ReplyDeleteClearwater Fla Real Estate
We agree with the comments of the other estate agents.
ReplyDelete